Your new home may look perfect. We check what you can't.
A professional, room-by-room inspection for newly constructed apartments and homes. Identify observable issues, document them with evidence, and get a clear report before you move in.
The rush of handover day conceals the flaws you inherit.
Handovers are typically fast-paced, cosmetic walk-throughs conducted under pressure. Fresh paint frequently masks underlying construction deviations that become costly repairs after move-in.
Acoustic Hollow Tiles
Poor adhesive bonding leaves void spaces under vitrified tiles, leading to cracked corners and loose floorboards within months.
Shower & Balcony Slope Traps
Incorrect tile slope in wet areas prevents natural drainage toward floor traps, creating chronic water stagnation and perimeter seepage.
Phase-Neutral Reversals
Invisible wiring errors, missing earthing on heavy appliance points, and non-tripping RCCB circuits leave appliances vulnerable.
Replacing hasty walkthroughs with disciplined observation.
We don't do informal glance-overs. InspectPro deploys methodical engineering checklists, calibrated tools, and non-destructive testing to verify structural finishes and utilities.
Standard Informal Walkthrough
- Conducted in 30 minutes alongside a hurried site representative.
- Limited to cosmetic scratches and superficial surface smudges.
- Verbal assurances scribbled informally on scrap notepads.
Systematic Engineering Audit
- Thorough 3 to 5-hour comprehensive room-by-room evaluation.
- Testing plumbing line pressures, circuit polarity, hollow tiles, and plumb alignments.
- Categorized, severity-tagged digital punch-list ready for builder contract sign-off.
Room-by-room, system-by-system scrutiny.
Our scopes cover both the visible architectural finishes and the functional utilities that support daily living.
Flooring & Tiles
Hollow acoustic checks, lippage unevenness, grouting continuity, slope verification toward drains.
Electrical Systems
Socket polarity, grounding verification, MCB/RCCB trip testing, switch plate alignments.
Plumbing & Sanitary
Trap seals, slow drainage diagnostics, water pressure drops, angle cock leaks, flush tank mechanism integrity.
Doors & Windows
Sash plumbness, silicone weather sealing, latch engagements, glass scratch audits, hinge clearances.
Walls & Ceilings
Hairline shrinkage cracks, dampness moisture readings, plaster undulations, paint unevenness.
Safety & Balconies
Railing anchor rigidity, parapet height compliance, glass balustrade vibration, child safety latch clearances.
A seamless five-step progression from booking to remediation.
Designed to fit neatly into your builder handover schedule without causing delays.
Book
Share your name and phone. Our lead coordinator calls back to log configuration and handover date.
Inspect
Our surveyor arrives with calibrated tools for an intensive 3–5 hour room-by-room audit.
Document
Every observable deviation is photographed, cross-referenced with exact room locations.
Review
Data is categorized into Critical, Attention, and Minor snags with clear repair notes.
Report
Receive your digital PDF inspection report within 24–48 hours to share directly with your builder.
Realistic digital inspection report preview.
Swipe or click the room tabs below to explore real recorded observations.
Hollow Tile Void Under Footfall Path
Acoustic tapping survey identified a ~0.45 sq.m void space beneath vitrified tiles near the doorway threshold. Inadequate adhesive bed.
Clear documentation builders cannot dismiss.
By presenting clear, measurable facts instead of subjective complaints, your rectification requests are resolved without disputes.
Plaster Level Deviation
Deviation >4mm along a 2-meter vertical straight edge, visible under ambient grazing light.
Missing Earth Circuit
Kitchen refrigerator socket showed 110V ground potential difference via digital tester.
Door Leaf Binding
Wooden door frame jamb binding at bottom left edge; scuffing from seasonal swelling.
Engineered precision, complete independence.
Zero Builder Affiliation
We do not take contractor commissions, do not perform renovation work, and have zero conflicts of interest. Our sole client is the property buyer.
Calibrated Tooling
We utilize precision spirit levels, socket polarity testers, digital moisture meters, laser measures, and tap hammers for measurable certainty.
Builder-Ready Punchlists
Reports are compiled with clear location tagging (Room > Wall > Fixture) so site engineers can immediately issue work orders to subcontractors.
Tailored for every stage of residential handover.
New Apartment Buyers
Prior to signing handover documents, identify snags while the builder's defect liability period is completely active.
Non-Resident Owners (NRIs)
Unable to be present on site? We act as your independent eyes, delivering exhaustive photo reports with zero travel needed.
Interior Fit-Out Planning
Identify concealed seepage, damp spots, and socket misalignments before custom woodwork is permanently installed.
Property Investors
Safeguard asset resale and rental yields by ensuring high construction quality prior to tenant move-in.
Request an inspection callback.
Enter your name and phone number below. Our lead coordinator will call you back directly to confirm your property configuration, location, and preferred inspection slot.
Requests route immediately to our engineering desk at info@thekeystonelab.com for swift priority dispatch.
Frequently asked questions.
The ideal window is right after the builder issues the pre-possession or intimation notice, but before you sign the final handover acceptance or release final balance payments. This gives you maximum leverage for swift rectification.
Yes. As a property buyer, you are fully entitled to inspect your purchased unit with any professional advisor or engineer prior to taking possession. Our surveyors maintain a calm, professional demeanor focused solely on factual documentation.
Completely non-destructive. We use calibrated ultrasound/tap testing for hollow tiles, electronic socket testers for wiring, moisture meters, and visual alignment tools. No walls are broken and no finishes are compromised.
You will receive your finalized digital PDF report within 24 to 48 hours following the on-site survey. This timeline allows our lead engineer to review and categorize all photographic evidence accurately.
You simply coordinate site access via your builder or local representative. We conduct the full audit, compile the photo report, and arrange a video consultation call to walk you through all critical findings.
Before you sign the handover, know exactly what you are accepting.
Book your independent pre-possession inspection today and safeguard your new home investment.